Historic Dowling Street Reconstruction


Summary

Dowing project is a reconstruction from Elgin Street to Dennis Street. KCM is managing the construction of reinforced concrete curb and gutter pavement, sidewalks, wheelchair ramps, driveways, storm sewer, sanitary sewer, water lines, landscaping, including bio-swales, rain gardens, sodding, tree planting and protection.

Project Highlights
  •  Project Cost: $4.6 Million

  •  ONGOING

  •  Project Location: Houston, TX

  •  Beautification of Dowling Street

Coushatta Tribe Water Treatment Plant


 Summary

Constructed on land held in trust for the Coushatta Tribe of Louisiana, the Coushatta WWTP is an on-site, 800,000 gallons per day (0.8 MGD) facility capable of expansion to 1.5 MGD. This SCADA controlled plant was delivered 45 days ahead of schedule via a Design/ Build delivery method. Construction was fast-tracked to accommodate the opening of the new Seven Clans Hotel and was delivered 6.5% under the initial budget. The facility includes two aeration and clarifier basins, expandable to a third. A disc filter was installed to meet the strict requirements of the EPA total suspended solids (TSS). Additional forced mains and lifts stations were installed and updated to accommodate the extra flow from the new hotel. Plans have begun on the addition of the third clarifier as Coushatta continues to expand.

Project Highlights
  • Project Cost: $8 Million

  • Project Duration: June 2011-April 2012

  • Project Size: 5.5 acres

  • Project Location: Kinder, LA

  • Installation of the Supervisory Control and Data Acquisition (SCADA) system to monitor equipment and process of the WWTP

  • Expandable design

Buffalo Run Convenience Store


Summary

The Buffalo Run retail store and gas station is a development on the Coushatta Reservation and will provide needed resources for the traveling and visiting public. The project will feature a full scale commercial kitchen in order to provide hot foods

Project Highlights
  •  Project Cost: $4 Million

  •  ONGOING

  •  Project Size: 5,000 SF retail outlet

  •  Project Size: 75,000 SF of Site Development

  •  Project Location: Kinder, LA

United Airlines New Terminal C North


Summary

United Airlines New Terminal C North is the construction of chilled and hot water supply lines that are underground.

Project Highlights
  •  Project Cost: $4.6 Million

  •  ONGOING

  •  Project Size: 114,500 SF

  •  Project Location: Houston, TX